- Alaska
- Arizona
- Arkansas
- California
- Delaware
- Hawaii
- Kentucky
- Louisiana
- Maryland
- Missouri
- New Jersey
- Ohio
- Pennsylvania
- Texas
- Utah
- Washington, D.C.
IFT Featured Missouri Job
72" Linestop Through a 48" Hot Tap.
Job Status: Successful and Completed | ||
Job Date: October 28, 2016 | ||
Location: Kansas City, MO | ||
1 - Hottap 72" x 48'' Pre Stressed Concrete Pipeline (PCCP) with By Pass 1 -72" x 48" Hottap Fitting for PCCP (apx. 40-PSI) (JCM 445 Shop Coated with Epoxy Coated Water Way) 1 -Installation of Hot Tap Fitting (Others to Provide 48" Gate Valve with Installation and Provide Support of Valve) 1 - Pressure Test of Assembly & 48" Hottap 1- 48" Loaner Valve Loaner 48" Knife Gate for Bypass- Removed Under Pressure after By Pass is Terminated. Includes Setting 48" Completion Plug and Supply Blind Flange with Zinc Plated NBG Sets. 1 - 72" Linestop Fitting for PCCP- 72" Inside Diameter (ID) (40 PSI or less) Less than 6 FPS (JCM 445 Shop Coated with Epoxy Coated Water Way) 1- Hot Tap to Allow for Linestop Entry 1 - Insertion of 72" Linestop 1 - 4'' Saddle with Gate Valve and Tap for Blow Down and Equalizing Pressure to Remove Linestops 1- Removal of Linestop, Install Completion Plug and Blind Flange Linestop Held for (7) days. Linestop® • Valve Inserting • Pipefreeze® • Large Tapping The City of Kansas City presented IFT with the opportunity to provide our services in order to allow the replacement of 72” valves on a Pre-Stressed Concrete Cylinder Pipe (PCCP) sewage force-main. Their 72” force-main being under pressure was a critical component of the Kansas City sewage collection system and the line could not be shut down. |
||